â–ş Listen Live
â–ş Listen Live

New Trail bridge goes to tender

A detailed timeline for Trail’s $9.8 million pedestrian pipe bridge is starting to take shape.

The city has announced they’ve put the project out to tender.

That includes a comprehensive one thousand page package with details about the structure that will cross the Columbia River.

Events and Communications Coordinator Andrea Jolly says they’ll accept bids until July 7th with the successful contractor required to start at the end of the summer.

The RDKB is to cover $4.2 million of the cost for the bridge’s regional sewer interceptor line.

Trail’s portion will include an 11.8 ft wide composite concrete deck to accommodate pedestrians, cyclists and a four-track emergency vehicle if required.

Continue Reading

chnv Now playing play

ckkc Now playing play

- Advertisement -

Related Articles

- Advertisement -

Latest News

Final weekend for Pumpkin Fest in Krestova

The seventh annual edition of the family-friendly event will be on from 10 a.m. to 5 p.m. today and tomorrow.

FortisBC urges winter outage preparedness

FortisBC is urging residents to be prepared for power outages as winter weather approaches.

28 animals removed from West Kootenay property amid cruelty investigation

Twenty-eight animals were removed from a rural property in the Kootenays earlier this month following an animal protection investigation involving concerns of irresponsible breeding and neglect. 

Cooling temperatures lift Category 3 open fire ban

As of noon today, Thursday, Oct. 16, all Category 3 open fires are once again permitted throughout the Southeast Fire Centre.

Tiny home lost in Passmore fire

A Passmore neighbour’s fast response helped prevent a fire from turning into a larger loss when a tiny home went up in flames Tuesday afternoon.
- Advertisement -