Afternoon, March 4th: Paulson Summit and Kootenay Pass closed for avalanche control

Two mountain passes along Highway 3 will be closed for avalanche control work starting at 12:00 p.m PST.

The Kootenay pass will be closed from then until 4:00 p.m and the alternate route is via the Kootenay Lake ferry. The estimated travel time between Nelson and Creston is 2.5 hours.

The Paulson Summit will also be closed, more specifically between East Lake Dr and the Paulson Cross Country Recsite,  from noon until 3:00 p.m PST.

Another update will be released by DriveBC.ca for each of the closures at their respective work completion times stated above.

 

 

 

Continue Reading

chnv Now playing play

ckkc Now playing play

- Advertisement -

Related Articles

- Advertisement -

Latest News

Canada Post employees represented by CUPW to give vote on final offers

Members with the Canadian Union of Postal Worker (CUPW) are set to vote on the final contract offer from Canada Post. 

B.C. bearing brunt of tariff war, says Eby ahead of First Ministers’ meeting

Premier David Eby said British Columbia is shouldering a disproportionate economic burden from Canada’s trade war with the U.S., and he’ll be calling for “basic fairness” at next week’s First Minister’s meeting.

B.C. limiting sales of two more diabetes drugs

British Columbia is limiting sales of two more diabetes drugs that are frequently prescribed off-label for weight loss.

Kootenays see low five-year average of human-caused wildfires

The Kootenay region has one of the lowest rates of human-caused wildfires in the province. 

Eby shuffles cabinet, including key jobs, public safety and housing roles

Premier David Eby shuffled his cabinet Thursday in what he called a “strategic” move to respond to a world that has changed since his B.C. NDP were elected last fall.
- Advertisement -